Project Owner: OAO "Rosneft"
Years of delivery: 2009-2010
Location: Tuapse, Krasnodar Krai, Southern Federal District
Total volume of metal structures: ~250 tons.
For this project, we developed Steel Structure Details, manufactured and shipped metal structures for the pumping station, grillage stands with rubber-metal shock absorbers for ball tanks (volume 2,000 m3), and fences. The structures were designed and manufactured with regard to the seismic activity of the region, which can be up to 9 points.
We also provided a package delivery of water pumping station building: a two-story rectangular building with a size of 60x18 m and a height of 11 m.
Tuapse Oil Refinery
Project Owner: OAO "Rosneft"
Years of delivery: 2009-2010
Location: Tuapse, Krasnodar Krai, Southern Federal District
Total volume of metal structures: ~250 tons.
For this project, we developed Steel Structure Details, manufactured and shipped metal structures for the pumping station, grillage stands with rubber-metal shock absorbers for ball tanks (volume 2,000 m3), and fences. The structures were designed and manufactured with regard to the seismic activity of the region, which can be up to 9 points.
We also provided a package delivery of water pumping station building: a two-story rectangular building with a size of 60x18 m and a height of 11 m.
Years of delivery: 2009-2010
Location: Tuapse, Krasnodar Krai, Southern Federal District
Total volume of metal structures: ~250 tons.
For this project, we developed Steel Structure Details, manufactured and shipped metal structures for the pumping station, grillage stands with rubber-metal shock absorbers for ball tanks (volume 2,000 m3), and fences. The structures were designed and manufactured with regard to the seismic activity of the region, which can be up to 9 points.
We also provided a package delivery of water pumping station building: a two-story rectangular building with a size of 60x18 m and a height of 11 m.
В настройках компонента не выбран ни один тип комментариев