Manufactured and delivered more than 20,000 tons of Steel Structures
Tyumen region, Tobolsk
2013, 2016-2017
Project Owner: OAO “ZapSibNeftekhim”
Development of the Steel Structures Details was carried out according to the design documentation of companies Linde Engineering (Germany) and Technip (France)
Complex for the deep processing of hydrocarbon raw material (CWM) into polyolefins
Manufactured and delivered more than 20,000 tons of Steel Structures
Tyumen region, Tobolsk
2013, 2016-2017
Project Owner: OAO “ZapSibNeftekhim”
Development of the Steel Structures Details was carried out according to the design documentation of companies Linde Engineering (Germany) and Technip (France)
Tyumen region, Tobolsk
2013, 2016-2017
Project Owner: OAO “ZapSibNeftekhim”
Development of the Steel Structures Details was carried out according to the design documentation of companies Linde Engineering (Germany) and Technip (France)
В настройках компонента не выбран ни один тип комментариев